josefschnell logo

Cable plough laying underground pipeline services trenchless technology subsea excavation installation power subsoil engineering UK crushing under roads rails rivers where open cutting or ploughing of long distance cable laying would not be possible.
Pipe laying with winches and trailers for windfarm, roads, rail and power cables.
Trenching cablelaying, rock trenching, sider plough, special trailers. Fibre winch, drains, water gas, telecom trench cutting work. Trenchers for rock and soil cable, pipe laying. Cablelaying vibration wheel ploughs, Spider plough. Dozer ploughs, rocksaws, Track Type vibration plough. Pipeline trenching, pipeline trenchless cable laying technology. Mole ploughing, highway trenching, ducts and drains cables instillation. Trencher hire, water,gas, telecoms, utilities construction. Environmentally friendly excavation cable laying

HOME
PLOUGHING ENVIROMENTAL REPORT CONTACT NEWS
APPLICATIONS
Telecomms

Fibre optic - ZERO TENSION
Communication ducts
Copper cables
Electricity
High voltage cables up to 132kV
Electrical ducts
Gas
HDPE up to 280mm at present
Water & Sewerage

HDPE up to 280mm at present
Railways
Multiple cables, ducts
and warning tape

Trench-less technology means combing the use of a cables or pipe plough and trailer, over open ground, under roads, water courses, ducts, drains, water, gas pipes, windfarm, rails or rivers sub soil for windfarm technology, pipe and cable laying where open cutting or ploughing would not be possible.

A typical application would be the laying of  33kv trefoil cable plus a copper earth, up to 4 No 40mm ducts for fibre optic control or
telecoms cables plus two 50mm standard yellow marker tapes. These are laid in one pass down to a depth of 2 metres and experience
has shown that there is no requirement for sanding the cables because the fines in the soil are the first layer around the cables.
This results in considerable cost saving and an average cablelaying rate of 800 – 1000 metres per day the site times and need for long
possessions and fencing off areas  are eliminated. Because no sub soil is brought to the surface re-instatement of the plough run is
completed quickly and the natural seed bed in grasslands or SSSI sites recover quicker.
All our operatives are full time employees of Josef Schnell and are fully conversant with the Health & Safety requirements of
operating within the UK. Together with an environmental policy strictly adhered to we feel that Josef Schnell has the answer to your
utility installation problems, be they electric, gas or water.


stamp

UVBstandard

UVDB standard
By providing the information requested in the UVDB online questionnaire suppliers will have met the pre-qualification needs of over 50 Utilities. These Utilities use the UVDB to source suppliers and do not need to issue as many of their own questionnaires. There are over 2500 individuals who regularly use the UVDB to create both long and short lists of suppliers and contractors.

windfarm
Contact
Tel. : 0049 72 23 / 51 10 - 21
Fax : 0049 72 23 / 51 10 - 44
Mobil: 0049-173 / 32 69 090

TheoSaathoff@josefschnell.de
Saathoff Theo UK and Germany

SYSTEM When installing utilities be they gas water or electricity we work to a Written Health and Safety policy also a comprehensive Environmental Policy Statement. We offer a fast, versatile, economical and environmentally friendly way to achieve this in any terrain or soil condition from running sand to friable rock . Up to 20 telecom or telemetry cables or ducts, 2 lightning protectors and 2 warning tapes can be laid simultaneously.
The winch truck can be positioned up to 125 metres ahead of the plough and even offset to the side of the route.
CLIENTS:-
SCOTTISH AND SOUTHERN ENERGY PLC. EASTERN ELECTRICITY, SCOTTISH POWER, BRITISH AIRPORT AUTHORITY,
BRITISH TELECOM TRIALS.